Project
Anthesis collaborated with trusted partners, SLR, Groundwork Wales, and Ainsworth and Parkinson, to collect, analyse and report on the generation and processing of industrial and commercial waste in Wales. The project spanned 18 months and included a 6-month survey period.
1,755 businesses were selected from across Wales via a statistically valid manner, and face-to-face surveys were carried out at company sites. The businesses came from a variety of sectors, including food manufacturers, chemical manufacturers, utility companies, retailers, hotel groups and office-based businesses.
Over 10,000 lines of data were collected and analysed, with the results presented to the client as part of an 80-page report.